工厂英文自我评价怎么写

2017-05-22

工厂的员工在流水线上的工作非常辛苦,但是英文版的自我评价要怎么写呢?下面是小编为大家带来的范文,相信对你会有帮助的。

工厂英文自我评价篇一

I work, has been engaged in a line of electrical work, over the years, I have strict demands on themselves, work conscientiously. Mainly from the following aspects to sum up:

First, the ideological and political learning and democratic management

I earnestly studied Marxism-Leninism, Mao Zedong Thought and Deng Xiaoping Theory, and guided the production practice in the spirit of the three represents.

Actively participate in all kinds of democratic activities, participate in democratic management, work hard at home, work well, and do a good job as a production frontline electrician.

Second, the safety aspects

1, implement the spirit of the higher documents to improve the safety awareness of workers, enhance the sense of responsibility of workers.

2, to implement and improve the safe use of electricity organizational system, improve safety management rules and regulations.

3, to strengthen safety management team to consolidate the security base.

4, one to ensure that electricity consumers to ensure their own safety and security of others.

Third, training and learning

Over the years, I actively participate in various learning and training, and strive to learn the basic knowledge of electrician knowledge, power supply system knowledge, line devices, lighting devices, grounding devices, transformer operation and maintenance, motor repair and maintenance, electrical control circuit, PLC Control and other related knowledge system. Every time I learn, I have learned some new theories, and used to guide the work practice, applied to the work, to the factory power supply system, the control system improvement, receives the consistent high praise.

Fourth, in terms of energy saving

In energy saving, I actively use the knowledge has been learned for the factory to do a lot of energy saving aspects of the contribution. Such as the transformation of the factory line, the annual energy saving for the factory more than ten million degrees. While the old factory equipment, electrical transformation, so that some of the old equipment to rejuvenate.

Fifth, the practice of production

In the production practice, for example: motor electrical fault detection and troubleshooting examples. Electrical: 1, check the lead wire insulation is intact, the motor is overheated, check whether the wiring meets the nameplate requirements, winding and the first, the end of power is correct; 2, measuring insulation resistance and DC resistance test insulation is damaged. 3, power on the check after the end of the problem found, you can directly power test with a three-phase voltage regulator began to impose a lower voltage, and then gradually increased to the rated voltage, etc .. 3, power-on check whether there is no open circuit, short circuit and grounding; . Use the above inspection method, for the factory more than one motor to find fault, and fix it. Timely summary of various symptoms and solutions, and documented, to guide the practice, but also improve their business level. In short, the production practice in the rules and regulations on the wall, in strict accordance with the rules and regulations. Over the years, the factory did not occur with a life-related electrical safety problems, and the factory through a number of technical transformation, equipment operation more scientific and rationalized.

工厂英文自我评价篇二

Since the beginning of my career, I have been constantly strengthening my self-cultivation, striving to improve the ideological and moral level, earnestly carry out the deepening of the cultural and professional knowledge, continue to explore new knowledge, forge ahead, and actively carry out intelligent range The work, the complete performance of a electrician's work responsibilities, from a good example to take the lead role. And actively participate in technological exchanges and technological innovation activities, the earth to do a good job, help, with the role, and fully completed the tasks assigned to the higher levels and targets in the company's production and development play its due role.Now I have been working since the professional and technical work are summarized as follows:

First, consciously strengthen theoretical study, and strive to improve personal qualities

Without a firm and true political orientation, there will be no positive guiding ideology. In order to continuously improve their political and ideological quality, the past few years I have been very concerned about national affairs, concerned about the situation at home and abroad, combined with the impact of changes in the situation of enterprises to analyze and put this idea into practical action to the production process to ensure In their thinking and action has always been consistent with the party and enterprise. At the same time, this idea into the work and study, the constant pursuit of their own progress. In order to be successful, a person's career must first learn how to behave! Especially in our highly technical work, to see things carefully, do things to concentrate on, to learn to be modest. Can not have the slightest sloppy and error. All the first work attitude to correct, have a good professional quality, work to be serious and responsible, subject to leadership arrangements, open to others to listen to advice and advice, to unite colleagues, courtesy, warm service.

Second, correct work attitude, play a leading role

I fully understand the importance of mechanical and electrical management during the construction period. In particular, it contains most of the invisible electrical infrastructure and engineering. It is necessary to supervise and inspect the problems at any time. We must solve the problems and never hastily. Otherwise, Eradication, which we place mechanical and electrical management in front of a test and responsibility. As an electrician, the responsibility and the burden of my duty. Therefore, in the usual work, I made myself some of the strict requirements: one in the face of dirty tired and bitter at work to grab the front of the workers dry, and more than the workers do the next; In the face of technical problems is to come forward and do their best to overcome technical difficulties; I always adhere to do my best to do everything to the interests of the company. Third, I asked myself to be responsible; I think that since he is an electrician, then the level of business and many other aspects of the general workers should be stronger than some. In the company assigned tasks, the general workers to complete the more difficult tasks, they should take the initiative to take on more, but not with the workers buck-passing, to make the teacher who demeanor, Yong burden. I usually not only ask their own, in practice, I also do according to these requirements.

Third, strengthen business learning, improve the technical level

Science and technology continue to develop today, one day do not learn to be backward. In particular, this piece of electrical automation, no one hundred percent of all proficient in finished, so I usually have time to look at professional books. Over the past year, I have collected a large number of new professional books, constantly enrich themselves, continue to grasp the new knowledge. Such as "electrical design drawing", "electronic technology", "modern frequency technology", "DC in industrial applications" and so on, in the process of learning this knowledge, I learned a lot of new knowledge, such as: PLC programming control Principle, ABB inverter settings and control principles, SIPMOS high-power two-way SCR control principle, and so I really benefit! Not only broadened my knowledge, is still largely improved my technical level, But also I have a higher level of theoretical and technical knowledge of the study had a keen interest.

Fourth, the development of skills to each other to achieve social services

In the usual work, I often carry out technical discussions and exchanges with other workers, to share their knowledge and share with others, and learn from others who do not understand their knowledge and achieve common progress. I am fully integrated theory and practice, continue to accumulate experience, continue to study new business, which makes my skill level to a skilled, use the ease of the point.

To sum up, I feel worthy of the honorable title of electrician! But I, as a technical staff, can not be narcissistic now, but still continue to strengthen their own learning, continue to learn from each other, and only then can keep up with The pace of the times steady progress, but also be able to better serve the enterprises and serve the community.

工厂英文自我评价篇三

Over the past year, I have been dedicated to work in a creative and loving way, and have achieved some achievements. However, there are also some problems and shortcomings, mainly in the following points:

1. Safety aspects

Safety management did not do bit, strength is not enough; safety training is not in place; check not in place. In many cases, due to the labor intensity of the staff is larger, more physical exertion, so the completion of the day's output, do the work of sorting the scene ignored the phenomenon, there are irregularities in the operation of the repeated repeated crushing accidents . Now want to come to these accidents, I have an inescapable responsibility. First: in the organization and management team in the process of daily safety training is not really so that every employee will always be safe production in mind; Second: in the security check did not do the whole process of tracking the entire inspection; Finally: in the event of an accident did not promptly Sum up lessons learned to avoid the recurrence of similar incidents. So that my staff suffered pain, so that the damage to the honor and interests of the workshop I am very self-blame. To this end, I decided to work in the future to strengthen the intensity of safety training and improve the form of training and strengthen the security team security responsibilities, so that each team staff are aware of the importance of safety in production, resulting in "everyone's attention to safety Production, everyone involved in production safety, "a good atmosphere.

2. Quality control aspects

Quality is produced, rather than check out, that is to say about total quality management, in accordance with the objectives and requirements to seriously do a good job in every aspect, every process.At the same time quality inspection is very important, especially in the production process of quality inspection can effectively avoid the occurrence of quality accidents and quality problems, after the event for the prevention and control in advance, change from passive to active.Although the company from top to bottom are beginning to pay attention to quality, but in practice there are still many problems, especially between the team, for example, in the weaving process there are many areas to be improved. To solve these problems is not a team can do a good job, which requires a number of relevant team work together, I think in order to do a good job of quality, we must grasp the "strict, fine, real" principle, to strict management, Careful and meticulous, pay close attention to implementation.

3. Team management

Although the management level of the team has been improved in the past year, there are still some problems, such as: the standardized work situation of the staff to be improved, the technical level of the staff to be improved, the enthusiasm of the staff has not been fully mobilized Wait.No high-level management, there is no high-quality staff, there is no high-quality products. Therefore, I will focus on the future work to improve the overall quality of the team and staff issues, make full use of spare time, and more arrangements for some of the knowledge of the standardization of training, strive for a shorter period of time so that the overall quality of staff has a larger Promotion.

更多相关阅读

最新发布的文章